And on it goes! Today we show you the technical standard we follow in the pre-installation of our projects.
Countless empty pipes and installations will later be hidden behind the double layers of walls. The townhouses have a KNX bus system so that the house can be controlled and monitored even in your absence or remotely. A high quality network installation. Thermostats in all rooms to control the underfloor heating and the DAIKIN inverter air-conditioning technology perfectly and in an energy-saving way. For this high level of technology in a comparatively small house, it is important to have a very well done technical project. Therefore, in addition to the architect and technical architect, we have an engineer who is only responsible for the installations. So that afterwards every cable is in the right place. And we don't lose any ceiling height because - as is often the case - each trade simply lays "its" installations across the existing ones.
Maybe a bit nerdy, but better a bit more effort in the planning. Than having to tear open walls later to find the right cables 😉
The outer shell of the pool is also almost finished, here you get a good impression on the photo how far we are!
And once again the almost final colour scheme. The colours always give rise to internal discussions, because our more technically inclined colleagues find all the fuss about "THE" right colour scheme completely superfluous and, of course, highly endangering the completion of the building. And the creative colleagues naturally do not understand why it is so difficult to simply implement the right colour scheme.
Again and again, I was asked whether the "back" houses actually have a sea view. Sure, the terraces are the same height. And they are designed identically. But to show that transparently, Miguel has taken a recent photo for you:
We are well on schedule! And half of the houses are already rented out! Many thanks to our "EarlyBirds" for the great trust, we will not disappoint you!